By the Cliont product team
Drainage improvement lead intake software for land management professionals

Know which drainage improvement leads deserve a site visit

Growers and ranchers describe the drainage issue type, affected acreage, and land ownership authority before you schedule anything, with photos of the standing water or failed system attached upfront so your crew knows exactly what they're driving into.

●Video greeting●Guided intake●Photo upload●Instant lead scoring
Live previewQuestion 1 of 7
What type of drainage issue are you experiencing?
Standing water in fields
Erosion or runoff problems
Existing drainage system not working

Preview your drainage improvement intake

Explore 7 questions from the Drainage Improvement template. This interactive preview uses illustrative scoring and sample attachments. Open the full survey to try the complete intake.

Preview
Your video greeting plays here

What a qualified drainage improvement lead should tell you

Assessment of standing water, erosion, or failed drainage systems on agricultural land, scoped by issue type, affected acreage, and whether the caller has authority to approve work on the property.

  • Drainage Issue Experiencing
  • How Large Affected Area
  • This Drainage Problem Affecting
  • Own This Land Or
  • Any Drainage Work Been
  • Soon Would Like This
  • There Any Known Utility

The questions your team needs answered

Every drainage improvement intake asks these — and why each one matters.

QuestionWhy it matters
What type of drainage issue are you experiencing?Flooding near structures and existing system failures carry the highest weights in the catalog, so this answer largely sets how urgently the lead should be treated.
Approximately how large is the affected area?Segments the lead so you can route, price, and prioritize it correctly.
Is this drainage problem affecting crop production or land usability now?A yes answer here (weight 9) signals an active production loss rather than a cosmetic issue, which should outrank leads that answer no (weight 4).
Do you own this land or have authority to approve drainage work on it?This carries the single highest weight in the catalog (10 vs 1), because scheduling with someone who lacks authority to approve work risks sending equipment to the wrong acreage.
Has any drainage work been done on this land before?Segments the lead so you can route, price, and prioritize it correctly.
How soon would you like this drainage work to begin?Timeline distinguishes an active-season emergency from a caller planning ahead for next year, which changes how soon a site visit needs to be scheduled.
Are there any known utility lines, wells, or septic systems in the affected area?Known utility lines, wells, or septic systems near the affected area change what a crew needs to plan for before digging or grading begins.

How Cliont scores drainage improvement leads

Configured answer weights help your team prioritize follow-up. Your team reviews each submission and decides the next step.

Value signals

  • Erosion or runoff problems
  • Existing drainage system not working
  • Not sure
  • This Drainage Problem Affecting: yes
  • Own This Land Or: yes

Urgency signals

  • Standing water in fields
  • Flooding near buildings or structures

See an example lead handoff

Illustrative lead details and score show how a submission can reach your team.

Drainage Improvement Lead

91/100
High Priority
Drainage issue typeStanding water in fields
Affected area1 to 10 acres
Affecting crop production nowYes
Owns land / has authorityYes
Prior drainage workYes, but it no longer works well
Desired startAs soon as possible
Utility lines or septic nearbyNo
Delivered to: Email · CRM · Calendar

From first click to qualified lead

Follow homeowners and property managers through one smooth, guided flow.

They land & meet you

Your video greeting plays instantly — a real face instead of a blank form.

They explain the job

Smart questions adapt to their job and capture the full scope.

They add photos

Damage photos and details come attached, so you assess before you drive out.

You get a ready lead

Scored and qualified — waiting for you to win it.

Built for drainage improvement workflows

Cliont capabilityDrainage Improvement application
Weighted lead scoringFlooding near buildings and existing drainage system failures carry the highest issue-type weights, so those calls surface above lower-weighted 'not sure' responses without your team sorting manually.
Photo and video captureCallers upload images of the standing water or failed drainage area during intake, letting your crew assess acreage and severity before deciding whether a site visit is needed.
Authority verificationThe ownership/approval-authority question is weighted at the top of the catalog, so tenants or unauthorized callers are visible in the lead record before a crew is dispatched to the wrong party.
Conditional routingAnswers about nearby utility lines, wells, or septic systems are attached to the lead record so scheduling can account for site hazards before equipment arrives.

Example drainage improvement lead scenarios

Illustrative situations explain the intake questions and possible follow-up.

Standing water hurting crop yield

The grower reports standing water in fields that's currently affecting crop production and confirms they own the land, which pushes the lead toward immediate priority.

Flooding near farm buildings

Flooding near structures is flagged as one of the highest-weighted issue types, so this lead surfaces ahead of routine acreage inquiries.

Erosion across a large parcel

Erosion or runoff on more than 10 acres, planned for next season rather than now, gets routed differently than an urgent standing-water case even though both score as high value.

Tenant without approval authority

A renter or property manager inquires about drainage work but answers no to having authority to approve it, a distinction the intake surfaces before anyone books a site visit.

Prior system that's failed again

An existing drainage system that no longer works, paired with an unknown answer on nearby utility lines, tells your crew to plan for investigation, not just installation.

Connect Cliont to your workflow

Connect your CRM

HubSpot, HighLevel, monday.com

Connect your legal software

Lawmatics, MyCase, Clio Manage and Clio Grow

Notify your team

Email, SMS, Slack

Configure other destinations

Google Sheets, configured webhooks, Zapier and API workflows

Simple, transparent pricing

Choose the plan that works for your business.

Most popular

Professional

Unlimited intake forms and leads for your growing business.

$397 / month
14-day free trial · Cancel anytime
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Advanced analytics dashboard
Try free for 14 days

Pay Per Lead

Only pay when you receive a qualified lead.

$47 / qualified lead
No setup fees · No monthly fees
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Charged only for submitted leads
Get started

Drainage Improvement lead-intake FAQs

How does the intake stop us from scheduling with someone who can't approve the work?

The intake asks directly whether the caller owns the land or has authority to approve drainage work, and that answer carries the highest weight in the catalog, so leads without approval authority are visibly flagged before you send anyone out.

Will we know the size of the affected area before quoting?

Yes, the intake captures whether the affected area is under 1 acre, 1 to 10 acres, or more than 10 acres, so you can gauge equipment and crew needs before the site visit.

What happens if the caller isn't sure what type of drainage problem they have?

The catalog includes a 'Not sure' option for issue type that still carries meaningful weight, so uncertain callers still route through as a lead worth a follow-up call rather than being dropped.

Does the intake warn us about utility lines or septic systems before we dig?

Yes, the intake asks whether there are known utility lines, wells, or septic systems in the affected area, so your team has that information ahead of scoping the visit.

How does urgency get reflected when someone wants work done ASAP versus next season?

The intake asks how soon the caller wants work to begin, and combined with whether the drainage issue is currently affecting crop production, that lets you separate acute cases from planning-ahead inquiries.

How is this different from an erosion control inquiry?

Drainage Improvement intake questions focus on standing water, failed drainage systems, and flooding near structures, while Erosion Control is a separate sibling subservice for runoff and soil loss on its own; overlapping cases still route based on the issue type the caller selects here.

Turn drainage improvement visitors into qualified jobs

Give every drainage improvement visitor a guided intake instead of a dead contact form — and get a scored, qualified lead before you drive out.