By the Cliont product team
Box build assembly lead intake software for electronics manufacturers

Know which box build leads are worth a capability review

Every box build enquiry captures design stage, unit volume, and BOM/sourcing readiness, plus supporting design files, so your team knows a run is real before your line commits to it.

Video greetingGuided intakeFile uploadInstant lead scoring
Live previewQuestion 1 of 6
What is the current stage of your product design?
Production-ready with documentation
Prototype built, docs incomplete
Concept or early design only

The exact intake your box build assembly leads complete

This is the real 6-question guided intake for Box Build Assembly — the same flow your customers finish before you ever pick up the phone.

Preview
Your video greeting plays here

What a qualified box build assembly lead should tell you

Mechanical and electrical assembly of a finished electronic product into its final enclosure, combining PCB or module integration, wiring/cable harnesses, and functional testing before packaging.

  • Current Stage Product Design
  • How Many Units Assembled
  • Assembly Include
  • Already Have Bill Materials
  • Authorized Approve Supplier This
  • Have Any Specific Certification

The questions your team needs answered

Every box build assembly intake asks these — and why each one matters.

QuestionWhy it matters
What is the current stage of your product design?Design maturity signals how much engineering support the build needs before it can move toward production tooling.
Approximately how many units do you need assembled per order?Order volume separates prototype-scale requests from production runs your line needs to plan capacity for.
What does the assembly need to include?Knowing whether wiring harnesses, enclosure work, and functional testing are all in scope prevents underquoting the labor involved.
Do you already have a bill of materials and approved component sourcing?A completed BOM with approved sourcing means the run can move toward scheduling without a component-sourcing detour first.
Are you authorized to approve a supplier for this project?If the requester can't approve a supplier, the deal still needs a decision-maker involved before it can move to contract.
Do you have any specific certification or compliance requirements for this product?Certification requirements determine whether the build needs a compliance review before it goes on the line.

How Cliont scores box build assembly leads

Every answer is weighted automatically — no manual review required.

Value signals

  • Production-ready with documentation
  • Prototype built, docs incomplete
  • Already Have Bill Materials: yes
  • Authorized Approve Supplier This: yes

See the lead your team receives

Box Build Assembly Lead

91/100
High Priority
Design stageProduction-ready with documentation
Order volume101-1000 units
Assembly scopePCB integration, wiring/cable harness, functional testing, packaging
BOM and approved sourcingYes
Authorized to approve supplierYes
Certification requirementsUL 60950 compliance needed
Delivered to: Email · CRM · Calendar

From first click to qualified lead

Follow owners and general contractors through one smooth, guided flow.

They land & meet you

Your video greeting plays instantly — a real face instead of a blank form.

They explain the project

Smart questions adapt to their project and capture the full scope.

They add photos & plans

Site photos and plans come attached, so you scope before you bid.

You get a ready lead

Scored and qualified — waiting for you to win it.

Built for box build assembly workflows

Cliont capabilityBox Build Assembly application
Weighted lead scoringBOM/sourcing readiness and supplier approval authority carry the heaviest weights, so a lead with a documented design and an authorized buyer surfaces above an early-concept inquiry.
Multi-select intake fieldsAssembly scope is captured as a multi-choice field, so your team sees upfront whether a build needs wiring harnesses, enclosure work, functional testing, or all three before pricing it.
Free-text capture for engineering reviewCertification and compliance requirements are collected as open text and passed through with the lead, rather than forcing a buyer into a fixed list that may not fit their product.
Volume-based lead tieringThe unit-volume field separates 1-10 unit prototype requests from 1,000+ unit production runs, helping avoid quoting a small line for a volume it can't support.

Common box build assembly lead scenarios

Production-ready run, high volume

Design is finished and documented, the order is in the hundreds or thousands of units, and the buyer already has an approved BOM and sourcing in place — this scores high and can move straight to scheduling.

Prototype needing sourcing support

A prototype exists but documentation and sourcing are incomplete, which lowers the score and signals the buyer may need Component Sourcing before a full box build can be quoted.

High-volume order with no BOM

Large stated volume paired with no completed BOM or approved sourcing is exactly the mismatch that risks quoting a run your line can't actually take — the intake flags this gap instead of letting it slip through.

Concept-stage inquiry, no authority

Early-stage design combined with a requester who isn't authorized to approve a supplier scores lower and is best routed to a follow-up rather than a capability review slot.

Small-batch build with certification needs

A low unit count with specific compliance or certification requirements noted in free text needs engineering eyes on the requirement before the assembly scope is finalized.

Connect Cliont to your workflow

Send leads

HubSpot, HighLevel, Salesforce, JobNimbus

Book projects

Google Calendar, Outlook Calendar, Calendly

Notify your team

Email, SMS, Slack

Automate follow-up

Zapier, Webhooks, API

Simple, transparent pricing

Choose the plan that works for your business.

Most popular

Professional

Unlimited intake forms and leads for your growing business.

$397 / month
14-day free trial · Cancel anytime
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Advanced analytics dashboard
Try free for 14 days

Pay Per Lead

Only pay when you receive a qualified lead.

$47 / qualified lead
No setup fees · No monthly fees
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Charged only for submitted leads
Get started

Box Build Assembly lead-intake FAQs

What happens if the buyer doesn't have a BOM yet?

The intake still captures the lead but scores it lower, since a missing bill of materials and unapproved sourcing typically means the project isn't ready for a full box build quote. It flags these leads so your team can steer them toward sourcing support instead of scheduling a capability review too early.

Can the form capture multiple assembly requirements in one submission?

Yes. The assembly scope question is multi-select, so a buyer can indicate PCB integration, wiring/cable harness work, enclosure assembly, functional testing, and packaging all in the same submission, giving your team the full scope before they respond.

What if the person filling out the form can't approve a supplier?

That answer carries its own weight in the score, so a lead from someone without supplier approval authority is still captured but marked as needing a decision-maker involved before it moves toward a contract.

Does the intake ask about certification or compliance requirements?

Yes, there's a free-text field for certification and compliance needs, which is forwarded with the rest of the lead so engineering can flag anything that changes the build process or timeline.

How does order volume affect how a lead is prioritized?

Unit volume is captured as a tiered field, from small prototype batches up to runs over 1,000 units, so leads can be sorted by production scale rather than treating a 5-unit prototype request the same as a 1,000-unit order.

How is this different from an intake built for PCB Assembly or Electronics Prototyping?

Box build assembly intake asks specifically about full enclosure and wiring scope, BOM readiness, and supplier approval authority, whereas PCB Assembly and Electronics Prototyping intakes on Cliont focus on board-level and early-design questions instead.

Turn box build assembly visitors into qualified projects

Give every box build assembly visitor a guided intake instead of a dead contact form — and get a scored, qualified lead before you send an estimator.