By the Cliont product team
Electronics testing lead intake software for electronics manufacturers

Know which electronics testing leads deserve a capability review

The guided intake captures the electronics type, the testing needed (functional, safety, EMC/EMI, or environmental), unit volume, and certification requirements, plus spec documents, before a request lands in your CRM.

Video greetingGuided intakeFile uploadInstant lead scoring
Live previewQuestion 1 of 7
What type of electronics need testing?
PCB assembly
Finished device or product
Individual component

The exact intake your electronics testing leads complete

This is the real 7-question guided intake for Electronics Testing — the same flow your customers finish before you ever pick up the phone.

Preview
Your video greeting plays here

What a qualified electronics testing lead should tell you

Verification of PCB assemblies, finished devices, individual components, or wiring harnesses against functional, safety, and regulatory requirements before a testing provider commits lab time or fixtures.

  • Electronics Testing
  • Testing
  • Many Units Tested
  • Have Design Or Specification
  • This Testing Required Meet
  • Testing Completed
  • Person Who Can Approve

The questions your team needs answered

Every electronics testing intake asks these — and why each one matters.

QuestionWhy it matters
What type of electronics need testing?The electronics type determines which fixtures, test equipment, and technician skill set a request actually needs.
What kind of testing do you need?Safety/regulatory compliance and EMC/EMI carry the highest weights because they involve stricter documentation and often external certification bodies.
How many units do you need tested?Unit volume signals whether the request is a one-off prototype check or a production-line commitment that could tie up test capacity for longer.
Do you have design or specification documents available for the tester to review?Whether design or spec documents are already available affects how quickly a tester can scope the job and quote accurately.
Is this testing required to meet a specific certification or regulatory standard?A confirmed certification or regulatory requirement raises the stakes of the test outcome and often narrows which lab or accreditation applies.
When do you need testing completed?Timeline helps with scheduling the capability review even though it isn't a scoring factor on its own.
Are you the person who can approve moving forward with a testing provider?Confirming the respondent can approve moving forward prevents your team from running a capability review for someone still gathering quotes internally.

How Cliont scores electronics testing leads

Every answer is weighted automatically — no manual review required.

Value signals

  • Functional testing
  • Safety or regulatory compliance testing
  • Environmental or stress testing
  • EMC/EMI testing
  • Not sure
  • Prototype (1-5 units)

Disqualifiers

  • Not sure yet

See the lead your team receives

Electronics Testing Lead

92/100
High Priority
Electronics typePCB assembly
Testing neededSafety/regulatory compliance, EMC/EMI testing
VolumeProduction volume (100+ units)
Spec documents availableYes
Certification requiredYes
TimelineAs soon as possible
ApproverYes
Delivered to: Email · CRM · Calendar

From first click to qualified lead

Follow owners and general contractors through one smooth, guided flow.

They land & meet you

Your video greeting plays instantly — a real face instead of a blank form.

They explain the project

Smart questions adapt to their project and capture the full scope.

They add photos & plans

Site photos and plans come attached, so you scope before you bid.

You get a ready lead

Scored and qualified — waiting for you to win it.

Built for electronics testing workflows

Cliont capabilityElectronics Testing application
Conditional question branchingThe electronics-type answer determines which testing-type options and follow-ups appear, so a wiring harness lead isn't asked PCB-specific fixture questions.
Weighted lead scoringSafety/regulatory compliance and EMC/EMI testing selections carry the highest weights, so certification-driven and interference-sensitive jobs surface above generic functional checks.
Document collection at intakeThe yes/no question on design or specification document availability lets you request the actual files upfront instead of chasing them after the capability review is booked.
Approver identificationThe approver yes/no question separates decision-makers from information-gatherers before your team invests time preparing a capability review.

Common electronics testing lead scenarios

Prototype needing safety certification

A buyer has 1-5 prototype units and needs safety or regulatory compliance testing before a certification deadline, even though volume is low the certification requirement pushes this to high value.

Production-volume EMC/EMI run

A buyer with 100+ units needs EMC/EMI testing and already has design documents ready, signaling a lead your line can likely take without a capability review surprise.

Buyer unsure what testing they need

The buyer selects 'Not sure' on testing type and 'not sure yet' on volume, so the intake still routes it forward but flags it for a scoping conversation rather than an immediate quote.

Non-approver gathering quotes

Someone fills out the intake but confirms they are not the person who can approve moving forward, which matters before your team spends time on a capability review with the wrong contact.

Wiring harness functional check

A buyer needs functional testing on a cable or wire harness rather than a PCB or finished device, a different electronics type that may require different fixtures or test benches.

Connect Cliont to your workflow

Send leads

HubSpot, HighLevel, Salesforce, JobNimbus

Book projects

Google Calendar, Outlook Calendar, Calendly

Notify your team

Email, SMS, Slack

Automate follow-up

Zapier, Webhooks, API

Simple, transparent pricing

Choose the plan that works for your business.

Most popular

Professional

Unlimited intake forms and leads for your growing business.

$397 / month
14-day free trial · Cancel anytime
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Advanced analytics dashboard
Try free for 14 days

Pay Per Lead

Only pay when you receive a qualified lead.

$47 / qualified lead
No setup fees · No monthly fees
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Charged only for submitted leads
Get started

Electronics Testing lead-intake FAQs

Does the intake tell us whether we're dealing with a PCB, a finished device, or a harness before we quote?

Yes, the electronics-type question separates PCB assembly, finished devices, individual components, and wiring or cable harnesses, so you know which test setup or fixture applies before anyone on your team looks at the request.

How does the intake treat leads who answer 'Not sure' about testing type?

'Not sure' answers on testing type are still scored as valuable rather than discarded, since the buyer may simply need scoping help, and the request is still routed to your CRM for follow-up.

What if the buyer doesn't have design or spec documents ready yet?

The intake asks directly whether design or specification documents are available; a 'no' answer is weighted lower but the lead still moves forward, giving your team a heads-up that a document request will be needed before the capability review.

Does the intake flag when a job is tied to a certification or regulatory standard?

Yes, there's a dedicated yes/no question on whether testing must meet a specific certification or regulatory standard, and that answer carries one of the higher weights in the scoring model.

We don't offer fixed turnaround dates, so does the timeline question hurt lead quality?

The timeline question (ASAP, within a month, or planning ahead) doesn't carry scoring weight, so it informs your scheduling without penalizing leads who don't have a fixed date yet.

How do we avoid running a capability review for someone who can't approve the work?

The intake asks directly whether the person submitting the request can approve moving forward with a testing provider, and that answer is weighted so non-approvers are visible before you commit review time.

Can this same intake logic support related services like PCB Assembly or Electronics Prototyping?

Electronics Testing has its own catalog and scoring, but Cliont builds a matching guided intake for sibling subservices like PCB Assembly, Component Sourcing, Cable and Wire Harness Assembly, Electronics Prototyping, and Box Build Assembly.

Turn electronics testing visitors into qualified projects

Give every electronics testing visitor a guided intake instead of a dead contact form — and get a scored, qualified lead before you send an estimator.