By the Cliont product team
Materials testing lead intake software for quality and testing professionals

Know which materials testing leads are worth a capability review

Buyers tell you what material they're testing, why the results matter, and whether samples are ready to ship, plus any specs or standards the material must meet, so your lab only schedules a capability review for requests it can actually run.

Video greetingGuided intakeFile uploadInstant lead scoring
Live previewQuestion 1 of 7
What type of material needs testing?
Metal
Polymer or plastic
Composite

The exact intake your materials testing leads complete

This is the real 7-question guided intake for Materials Testing — the same flow your customers finish before you ever pick up the phone.

Preview
Your video greeting plays here

What a qualified materials testing lead should tell you

Laboratory or field verification of a material's mechanical, chemical, thermal, or corrosion properties against a specification, standard, or failure investigation, before a lab commits capacity to the run.

  • Material Testing
  • Main Purpose This Testing
  • Test Result
  • Have Material Samples Ready
  • Results Within Specific Timeframe
  • Authorized Approve This Testing
  • Have Any Relevant Specifications

The questions your team needs answered

Every materials testing intake asks these — and why each one matters.

QuestionWhy it matters
What type of material needs testing?Material type tells your team immediately whether the request fits your lab's equipment, since metal, composite, and ceramic testing often require different capability.
What is the main purpose of this testing?Compliance, failure investigation, and supplier qualification purposes are weighted well above routine checks and general research, so this answer drives most of the lead score.
What kind of test result do you need?Mechanical and chemical composition requests score higher than 'not sure,' helping your team distinguish a defined test plan from an inquiry that still needs scoping.
Do you have material samples ready to send for testing?Samples ready to ship score higher than none in hand, signaling how soon a capability review can actually turn into a scheduled run.
Do you need results within a specific timeframe?Segments the lead so you can route, price, and prioritize it correctly.
Are you authorized to approve this testing on behalf of your organization?Confirming the buyer can approve testing on their organization's behalf prevents your team from scoping and quoting a run that never gets signed off.
Do you have any relevant specifications or standards the material must meet?Captures the detail in the client’s own words so you’re briefed before the first call.

How Cliont scores materials testing leads

Every answer is weighted automatically — no manual review required.

Value signals

  • Compliance or certification requirement
  • Investigating a failure or defect
  • Qualifying a new material or supplier
  • Routine quality check
  • Mechanical properties (strength, hardness, etc.)
  • Chemical composition analysis

Urgency signals

  • Urgent, within days

See the lead your team receives

Materials Testing Lead

92/100
High Priority
Material typeMetal
PurposeCompliance or certification requirement
Test results neededMechanical properties, chemical composition
Samples readyYes
TimeframeUrgent, within days
Authorized to approveYes
SpecificationsMust meet ASTM A370
Delivered to: Email · CRM · SMS notification

From first click to qualified lead

Follow owners and general contractors through one smooth, guided flow.

They land & meet you

Your video greeting plays instantly — a real face instead of a blank form.

They explain the project

Smart questions adapt to their project and capture the full scope.

They add photos & plans

Site photos and plans come attached, so you scope before you bid.

You get a ready lead

Scored and qualified — waiting for you to win it.

Built for materials testing workflows

Cliont capabilityMaterials Testing application
Weighted scoringCompliance, failure investigation, and supplier qualification purposes score higher than routine checks or general research, so capability reviews get prioritized by real commercial weight, not first-come order.
Conditional routingA 'not yet' answer on sample readiness routes the lead differently than a sample-in-hand answer, letting your team schedule logistics follow-up instead of a full capability review too early.
Gatekeeping questionThe authorization question stops your team from quoting a run for someone who can't actually approve the work, protecting line capacity from being reserved on a request that stalls.
Free-text captureThe specifications field pulls the exact standard or spec the material must meet directly into the lead record, so your team isn't chasing that detail after the intake.

Common materials testing lead scenarios

Certification deadline under pressure

Buyer needs compliance or certification testing with results due within days and samples already boxed up; the intake flags this as high value and urgent so it doesn't sit in a queue.

Field failure under investigation

Buyer is chasing a defect and needs mechanical and corrosion data but hasn't shipped anything yet; the intake captures the failure context so your team can scope the run before samples arrive.

New supplier material qualification

Buyer is qualifying a new material or supplier with a flexible timeline and needs chemical composition data; the intake still scores it as valuable even without urgency.

Unauthorized early research inquiry

Buyer picks general research as the purpose and isn't authorized to approve testing on behalf of their organization; the intake still logs it, but scores it for a lighter follow-up rather than a full capability review.

Connect Cliont to your workflow

Send leads

HubSpot, HighLevel, Salesforce, JobNimbus

Book projects

Google Calendar, Outlook Calendar, Calendly

Notify your team

Email, SMS, Slack

Automate follow-up

Zapier, Webhooks, API

Simple, transparent pricing

Choose the plan that works for your business.

Most popular

Professional

Unlimited intake forms and leads for your growing business.

$397 / month
14-day free trial · Cancel anytime
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Advanced analytics dashboard
Try free for 14 days

Pay Per Lead

Only pay when you receive a qualified lead.

$47 / qualified lead
No setup fees · No monthly fees
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Charged only for submitted leads
Get started

Materials Testing lead-intake FAQs

How does the intake separate a certification deadline from a routine quality check?

The testing-purpose question weights compliance, failure investigation, and supplier qualification higher than a routine check, and the timeframe question flags anything due within days, so both signals combine to prioritize which capability reviews get booked first.

What happens if the buyer picks 'Not sure' for the type of test result they need?

That answer is still captured and scored lower than a specific mechanical or chemical composition request, but the lead still comes through so your team can clarify scope during the capability review rather than losing the inquiry.

Can buyers tell us which ASTM or ISO standard the material has to meet?

Yes, the specifications question is a free-text field where buyers can note the exact standard or spec the material must meet, which arrives with the lead in your CRM instead of getting clarified over email later.

What if the buyer hasn't sent material samples yet?

The sample-readiness question is a simple yes/no; a 'not yet' answer still scores the lead, just lower than one with samples ready to ship, so you know whether to schedule the review now or wait on logistics.

How do we avoid quoting a run our line can't actually take?

The authorization question confirms the buyer can approve testing on behalf of their organization before your team spends time scoping capacity, cutting down on quotes built for requests that were never going to be signed off.

Does the intake distinguish between metals, composites, and other material types?

Yes, the material-type question captures whether it's metal, polymer, composite, ceramic, textile, or other, so your team can see at a glance whether the request fits your lab's testing capability before a capability review is scheduled.

Turn materials testing visitors into qualified projects

Give every materials testing visitor a guided intake instead of a dead contact form — and get a scored, qualified lead before you send an estimator.