By the Cliont product team
Tilt-up concrete lead intake for commercial concrete contractors

Know which tilt-up concrete leads are worth a site walk

Our intake asks owners and developers about project stage, wall panel count, and whether engineered drawings are ready, then collects site plans before routing qualified projects to your CRM.

Video greetingGuided intakeFile uploadInstant lead scoring
Live previewQuestion 1 of 6
What best describes your role on this project?
Developer/Property Owner
Facility Manager
Architect/Engineer

The exact intake your tilt-up concrete leads complete

This is the real 6-question guided intake for Tilt-Up Concrete — the same flow your customers finish before you ever pick up the phone.

Preview
Your video greeting plays here

What a qualified tilt-up concrete lead should tell you

Planning or executing tilt-up concrete wall panel construction for a commercial building, where qualification hinges on project stage, panel count, available casting yard space, and whether engineered drawings already exist.

  • Best Describes Role On
  • Current Stage This Tilt-Up
  • How Many Wall Panels
  • There Enough On-Site Space
  • Already Have Structural Drawings
  • Have Authority Approve Contracts

The questions your team needs answered

Every tilt-up concrete intake asks these — and why each one matters.

QuestionWhy it matters
What best describes your role on this project?The role answer tells your team whether they're talking to the decision-maker, an advisor, or a downstream contractor coordinating the work.
What is the current stage of this tilt-up project?Project stage carries the highest weights in the catalog, so it's the strongest single signal for how soon a site walk should happen.
Approximately how many wall panels does this project require?Panel count gives your estimator a scope reference for sizing the walk-through even though it doesn't carry its own weight.
Is there enough on-site space to cast panels flat before lifting?Available casting yard space determines whether panels can be cast flat on-site or need an alternate lift strategy, which changes the scope of the walk.
Do you already have structural drawings or engineered plans for the panels?Having engineered drawings already in hand is the strongest urgency signal that this project is close to breaking ground.
Do you have authority to approve contracts or hire for this project?Contract approval authority flags whether the respondent can actually move the project forward or needs to loop in someone else first.

How Cliont scores tilt-up concrete leads

Every answer is weighted automatically — no manual review required.

Value signals

  • Planning/Design
  • Permitting
  • Ready to Start Construction
  • Already in Progress
  • Not Sure
  • There Enough On-Site Space: yes

Urgency signals

  • Already Have Structural Drawings

See the lead your team receives

Tilt-Up Concrete Lead

92/100
High Priority
RoleDeveloper/Property Owner
Project StageReady to Start Construction
Wall Panel Count10 to 30
On-Site Casting SpaceYes
Engineered Drawings ReadyYes
Contract AuthorityYes
Delivered to: Email · CRM · Calendar

From first click to qualified lead

Follow owners and general contractors through one smooth, guided flow.

They land & meet you

Your video greeting plays instantly — a real face instead of a blank form.

They explain the project

Smart questions adapt to their project and capture the full scope.

They add photos & plans

Site photos and plans come attached, so you scope before you bid.

You get a ready lead

Scored and qualified — waiting for you to win it.

Built for tilt-up concrete workflows

Cliont capabilityTilt-Up Concrete application
Weighted scoring rulesRanks Ready to Start Construction and Permitting-stage projects above early Planning/Design enquiries based on the project-stage weights.
Conditional branchingShows different follow-up context to an Architect/Engineer than to a Developer/Property Owner without changing the core technical questions.
Document upload captureLets owners attach existing structural or engineered drawings when they confirm plans are ready, so your estimator sees them before the site walk.
CRM lead routingPushes leads tagged with panel count and casting-space answers straight into the matching stage of your CRM pipeline.
Decision-maker flaggingSurfaces contract-authority answers so leads without approval power are routed for confirmation before a site walk is scheduled.

Common tilt-up concrete lead scenarios

Ready-to-build project, plans in hand

A developer selects Ready to Start Construction and confirms engineered drawings already exist, so the lead scores high and is routed for an immediate site walk.

Early planning, no drawings yet

A project still in Planning/Design with no structural drawings still qualifies, but the intake flags it as needing design coordination before an estimate.

Large job, tight casting yard

An enquiry with over 30 panels but no room to cast flat on-site is flagged so your team can evaluate crane-lift logistics before committing to a walk-through.

Architect scoping, no authority

An Architect/Engineer answers the technical questions but doesn't have authority to approve contracts, so the lead is captured but marked as advisory rather than decision-ready.

Uncertain stage and panel count

A lead who selects Not Sure for both project stage and panel count still gets scored, but is routed for a clarifying follow-up before a site walk is scheduled.

Connect Cliont to your workflow

Send leads

HubSpot, HighLevel, Salesforce, JobNimbus

Book projects

Google Calendar, Outlook Calendar, Calendly

Notify your team

Email, SMS, Slack

Automate follow-up

Zapier, Webhooks, API

Simple, transparent pricing

Choose the plan that works for your business.

Most popular

Professional

Unlimited intake forms and leads for your growing business.

$397 / month
14-day free trial · Cancel anytime
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Advanced analytics dashboard
Try free for 14 days

Pay Per Lead

Only pay when you receive a qualified lead.

$47 / qualified lead
No setup fees · No monthly fees
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Charged only for submitted leads
Get started

Tilt-Up Concrete lead-intake FAQs

How does the intake handle a developer, architect, and general contractor all inquiring about the same project?

The role question separates who's asking, but everyone answers the same questions about project stage, panel count, and drawings, so your team gets consistent technical detail regardless of who submitted the form.

What happens if the site doesn't have enough room to cast panels flat before lifting?

Answering no on the casting-space question still submits the lead, just with a lower weight, so your estimator knows to evaluate crane-only lift logistics before scheduling a walk-through.

Do owners need finished structural drawings to submit an enquiry?

No. Drawings aren't required to submit, but answering yes signals a project that's closer to construction-ready and worth prioritizing for a site walk.

Does panel count directly change a lead's score?

Panel count is captured as context for scoping the project, and combined with project stage and drawing status it helps your team size the walk-through request rather than driving the score on its own.

What if the person filling out the form can't approve the contract?

The intake still captures and scores the lead, but flags when the respondent lacks contract authority so your team knows to confirm the actual decision-maker before booking a site walk.

Which project stages get prioritized for follow-up?

Ready to Start Construction and Permitting carry the highest weights, so those leads surface above early Planning/Design or Not Sure responses.

Turn tilt-up concrete visitors into qualified projects

Give every tilt-up concrete visitor a guided intake instead of a dead contact form — and get a scored, qualified lead before you send an estimator.