By the Cliont product team
Water damage rebuild lead intake software for restoration professionals

Know which water damage rebuild leads are worth an assessment

Your intake asks which areas need rebuilding, whether extraction and drying is already finished, and whether there's an active insurance claim, then collects damage photos before the lead ever reaches your CRM.

Video greetingGuided intakePhoto uploadInstant lead scoring
Live previewQuestion 1 of 6
What areas of the property need rebuilding after water damage?
Flooring
Drywall or walls
Ceilings

The exact intake your water damage rebuild leads complete

This is the real 6-question guided intake for Water Damage Rebuild — the same flow your customers finish before you ever pick up the phone.

Preview
Your video greeting plays here

What a qualified water damage rebuild lead should tell you

Structural reconstruction of flooring, drywall, ceilings, cabinetry, or framing after water damage, once extraction and drying are finished or underway — spanning everything from a single damaged room to a full property rebuild.

  • Areas Property Rebuilding After
  • Water Extraction And Drying
  • Property Affected
  • Property Owner Or Authorized
  • There Active Insurance Claim
  • Soon Want Rebuild Work

The questions your team needs answered

Every water damage rebuild intake asks these — and why each one matters.

QuestionWhy it matters
What areas of the property need rebuilding after water damage?Structural framing carries the highest weight of the listed damage areas, so leads involving framing or multiple areas signal a larger rebuild scope than an isolated flooring or drywall job.
Has the water extraction and drying process already been completed?A 'Yes' means drying is already done and a rebuild crew can be scheduled right away, while a 'No' signals the job still needs structural drying before rebuild work can start.
What type of property is affected?Segments the lead so you can route, price, and prioritize it correctly.
Are you the property owner or authorized to approve rebuild work?The heavy weight on 'No' flags inquiries from people who can't actually approve the work, so they can be confirmed before an assessment slot is committed.
Is there an active insurance claim related to this damage?An active claim identifies insurance-funded jobs that typically require different documentation and payment handling than out-of-pocket rebuilds.
How soon do you want the rebuild work to start?Selecting 'Immediately' marks a lead ready to move now, letting the team prioritize scheduling ahead of leads still in the planning stage.

How Cliont scores water damage rebuild leads

Every answer is weighted automatically — no manual review required.

Value signals

  • Flooring
  • Drywall or walls
  • Ceilings
  • Cabinetry or fixtures
  • Not sure
  • Water Extraction And Drying: yes

Urgency signals

  • Structural framing
  • Water Extraction And Drying
  • Yes, active claim
  • Immediately

See the lead your team receives

Water Damage Rebuild Lead

92/100
High Priority
Areas needing rebuildStructural framing, Drywall or walls, Flooring
Extraction and drying completedYes
Property typeSingle-family home
Authorized to approve workYes
Active insurance claimYes, active claim
Desired startImmediately
Delivered to: Email · CRM · SMS notification

From first click to qualified lead

Follow homeowners and property managers through one smooth, guided flow.

They land & meet you

Your video greeting plays instantly — a real face instead of a blank form.

They explain the job

Smart questions adapt to their job and capture the full scope.

They add photos

Damage photos and details come attached, so you assess before you drive out.

You get a ready lead

Scored and qualified — waiting for you to win it.

Built for water damage rebuild workflows

Cliont capabilityWater Damage Rebuild application
Conditional branchingIf a lead reports extraction and drying isn't finished yet, the intake can flag that separately from completed jobs so it isn't scheduled as a straight rebuild assessment.
Weighted lead scoringStructural framing carries the highest weight of the damage-area options, so jobs involving framing repair score higher than isolated flooring or drywall work.
Authorization checksThe owner/authorization question is weighted heavily on 'No,' so inquiries from non-authorized parties are flagged for confirmation before an assessment gets booked.
Insurance-status taggingLeads are tagged by whether they have an active claim, no claim, or an uncertain claim status, so your CRM can route insurance-pay and out-of-pocket rebuild jobs differently.
Timeline-based prioritizationLeads that select 'Immediately' for start time can be surfaced ahead of 'Still planning' leads in your CRM queue.

Common water damage rebuild lead scenarios

Structural framing damage, ready now

The property owner selects structural framing plus flooring and drywall, confirms extraction and drying are already complete, and wants work to start immediately — the highest-weighted combination the intake can surface.

Extraction and drying not finished

A caller wants a rebuild quote before drying has actually finished; the intake flags this so the team can route them toward structural drying first instead of scheduling a rebuild crew too early.

Insurance claim filed, still planning

An active insurance claim is in place but the owner is still planning timing rather than ready immediately, so the lead is qualified but tagged as lower urgency for scheduling order.

Tenant inquiry, unsure of scope

Someone who isn't authorized to approve the work selects 'Not sure' for the damaged areas, prompting a follow-up to confirm ownership and scope before an assessment is booked.

Commercial multi-room rebuild

A commercial building owner reports damage to cabinetry, drywall, and framing across multiple rooms with an active claim, signaling a larger-scope job that should be prioritized differently from a single-room residential rebuild.

Connect Cliont to your workflow

Send leads

HubSpot, HighLevel, Salesforce, JobNimbus

Book jobs

Google Calendar, Outlook Calendar, Calendly

Notify your team

Email, SMS, Slack

Automate follow-up

Zapier, Webhooks, API

Simple, transparent pricing

Choose the plan that works for your business.

Most popular

Professional

Unlimited intake forms and leads for your growing business.

$397 / month
14-day free trial · Cancel anytime
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Advanced analytics dashboard
Try free for 14 days

Pay Per Lead

Only pay when you receive a qualified lead.

$47 / qualified lead
No setup fees · No monthly fees
  • Unlimited intake forms
  • Custom video greetings
  • AI-powered voice bot
  • English + Spanish support
  • Automatic lead scoring
  • Digital estimates & e-signatures
  • Photo, video & file upload
  • Charged only for submitted leads
Get started

Water Damage Rebuild lead-intake FAQs

What happens if a lead says extraction and drying still aren't finished?

The intake records that answer as lower urgency compared to a completed drying job, since a rebuild crew generally can't start until drying is done. You can use this to route the lead toward structural drying first rather than scheduling a rebuild assessment prematurely.

How does the intake handle someone who isn't the property owner?

The authorization question flags anyone who answers that they're not the owner or authorized approver, so those leads can be followed up on for confirmation before you commit an assessment slot.

Does the intake tell me if a job is insurance-funded?

Yes — the active insurance claim question captures whether a claim has been filed, hasn't been filed, or is uncertain, which you can use to tag leads for different documentation and payment workflows in your CRM.

Can I tell residential rebuild jobs apart from commercial ones?

The property type question separates single-family, multi-unit residential, and commercial buildings, so commercial rebuild leads can be routed to the right team or estimator.

What does a 'Not sure' answer on damage areas mean for scoring?

It's scored lower than specific, high-weight selections like structural framing, since the scope isn't confirmed yet — a signal that the lead may need a scoping call before you can size the job.

How do I know which rebuild leads want to start right away?

The desired start-time question distinguishes leads ready immediately from those still planning, so you can prioritize scheduling for the ones that want to move now.

Turn water damage rebuild visitors into qualified jobs

Give every water damage rebuild visitor a guided intake instead of a dead contact form — and get a scored, qualified lead before you drive out.